Last night, water penetrated the 4th floor switches that provide connectivity to floors 4,5 in the NE quadrant of Cordley. Wireless *may* continue operate on those floors, at least for a day or 2, but most wired connections are out of commission.

We are in the process of locating replacement equipment, but OSU-Net will do an inspection in the network cabinets to assess the extent of the water damage. In the event that water has penetrated the physical wiring the outage for all 5 floors in the affected corner (NE) of Cordley may extend into next week while patch panels, and potentially wiring, is replaced.

Check this web site for changes in status or new information.