There was a power outage around 7 am this morning for parts of the OSU campus that included our data center room.  The power transfer switch between the backup generator and the ALS building failed resulting in no power being provided to the data center room during the power outage. The main UPS lasted ~40 minutes before power was lost and all CoSINe network services went down.  Power has since been restored to campus and all CoSINe network services are back online ~11am.